{
  "$type": "site.standard.document",
  "bskyPostRef": {
    "cid": "bafyreietkqynfzal7wnrhacoiojynd5jozh3hmiirjv3ktfiwggurlbrxi",
    "uri": "at://did:plc:oiokqdfjz4ivqojfpkojv6sy/app.bsky.feed.post/3miyamqija232"
  },
  "coverImage": {
    "$type": "blob",
    "ref": {
      "$link": "bafkreibt7pzljlxvt33ihc3e3t4kvxcsowgvxdwyxggwnmgvz34xfrqvoe"
    },
    "mimeType": "image/png",
    "size": 80764
  },
  "description": "The CAISO published its draft 2025–2026 Transmission Plan, which identifies 38 transmission projects totaling $7 billion over the next decade. These projects combine new infrastructure with upgrades to existing lines, plus the targeted use of grid-enhancing technologies to expand capacity at lower cost.",
  "path": "/caiso-draft-plan-congestion-surge-forces-7-billion-transmission-buildout-to-serve-load-growth/",
  "publishedAt": "2026-04-08T12:00:27.000Z",
  "site": "https://www.calregulatory.com",
  "tags": [
    "published its draft 2025–2026 Transmission Plan",
    "Subscribe now"
  ],
  "textContent": "The CAISO published its draft 2025–2026 Transmission Plan, which identifies 38 transmission projects totaling **$7 billion** over the next decade. These projects combine new infrastructure with upgrades to existing lines, plus the targeted use of grid-enhancing technologies to expand capacity at lower cost.\n\n### This post is for subscribers only\n\nBecome a member to get access to all content\n\nSubscribe now",
  "title": "CAISO Draft Plan: Congestion Surge Forces $7 Billion Transmission Buildout to Serve Load Growth",
  "updatedAt": "2026-04-08T14:53:21.887Z"
}