{
  "$type": "site.standard.document",
  "bskyPostRef": {
    "cid": "bafyreifhulso3zahrfqpelcea7pj5nf2aa4zgr7m5p57ggps46uodmwiv4",
    "uri": "at://did:plc:oiokqdfjz4ivqojfpkojv6sy/app.bsky.feed.post/3mg44znc7vht2"
  },
  "coverImage": {
    "$type": "blob",
    "ref": {
      "$link": "bafkreifnjevcd3ncsz5gf7bv56bqwjmnlr7lshr7sikp26oxmpxgbvpp7q"
    },
    "mimeType": "image/png",
    "size": 60083
  },
  "description": "PG&E and SoCalGas submitted their major, planned natural gas infrastructure investments under the CPUC's General Order 177 long-term gas planning framework.\n\nThe filings highlight a statewide wave of large-scale reliability, safety, and compliance projects focused on modernizing aging compressor stations, rebuilding critical transmission and terminal facilities, and replacing or retrofitting high-pressure pipelines through the 2026–2035 period.",
  "path": "/pg-e-and-socalgas-sdg-e-spending-billions-to-perform-gas-system-overhauls/",
  "publishedAt": "2026-03-02T20:50:59.000Z",
  "site": "https://www.calregulatory.com",
  "tags": [
    "General Order 177",
    "Subscribe now"
  ],
  "textContent": "PG&E and SoCalGas submitted their major, planned natural gas infrastructure investments under the CPUC's General Order 177 long-term gas planning framework.\n\nThe filings highlight a statewide wave of large-scale reliability, safety, and compliance projects focused on modernizing aging compressor stations, rebuilding critical transmission and terminal facilities, and replacing or retrofitting high-pressure pipelines through the 2026–2035 period.\n\n### This post is for subscribers only\n\nBecome a member to get access to all content\n\nSubscribe now",
  "title": "PG&E and SoCalGas/SDG&E Spending Billions to Perform Gas-System Overhauls",
  "updatedAt": "2026-03-03T22:56:15.050Z"
}