{
  "$type": "site.standard.document",
  "bskyPostRef": {
    "cid": "bafyreif2a536ylqz7rkw72gvjwy6oubifrec5txi5aixip5kvcnjbdz3qm",
    "uri": "at://did:plc:o7x3aaueo7gbdj5s6ywwl7sl/app.bsky.feed.post/3meaum3opys22"
  },
  "coverImage": {
    "$type": "blob",
    "ref": {
      "$link": "bafkreidzwrfsihrly7cwlnzt3q7hgeu5dqdlxmoe5rs4umyum4hfw2ktj4"
    },
    "mimeType": "image/jpeg",
    "size": 111147
  },
  "path": "/dpm-metals-extends-chelopech-mine-life-to-10-years/?utm_source=rss&utm_medium=rss&utm_campaign=dpm-metals-extends-chelopech-mine-life-to-10-years",
  "publishedAt": "2026-02-06T13:13:56.000Z",
  "site": "https://thedeepdive.ca",
  "tags": [
    "Latest",
    "Resources",
    "DPM Metals",
    "DPM Metals Extends Chelopech Mine Life To 10 Years",
    "the deep dive"
  ],
  "textContent": "\n\nDPM Metals (TSX: DPM) has extended the mine life of their flagship asset. The extension follows an update to the mineral resource and reserve estimate for the Chelopech mine in Bulgaria following extensive exploration. Chelopech has seen the life of mine extended to 2036, resulting in a remaining life of mine of ten years. Production […]\n\nThe post DPM Metals Extends Chelopech Mine Life To 10 Years appeared first on the deep dive.",
  "title": "DPM Metals Extends Chelopech Mine Life To 10 Years"
}