{
  "$type": "site.standard.document",
  "bskyPostRef": {
    "cid": "bafyreif3tbcynkfwngsjv3sycisf6o44l3xqhl7aqqwkntxlnkj4nfui4m",
    "uri": "at://did:plc:nrkefxef43of7hny4ynmjv43/app.bsky.feed.post/3mkcsdxfpb7s2"
  },
  "coverImage": {
    "$type": "blob",
    "ref": {
      "$link": "bafkreiembfceltbgn6spvnm5z2vqfa2bfxf3avls4apmplq3lybzn3lfjq"
    },
    "mimeType": "image/jpeg",
    "size": 456608
  },
  "path": "/2026/04/24/cta-breaks-ground-on-red-line-extension-six-decades-after-it-was-first-promised/",
  "publishedAt": "2026-04-24T20:23:26.000Z",
  "site": "https://blockclubchicago.org",
  "tags": [
    "Pullman",
    "Roseland",
    "Roseland, Pullman",
    "Transportation",
    "West Pullman, Riverdale"
  ],
  "textContent": "The 5.6-mile, $5.75 billion project will move the Red Line's south end from 95th to 130th Street, and create four new stops along the way.",
  "title": "CTA Breaks Ground On Red Line Extension — Six Decades After It Was First Promised"
}