{
"$type": "site.standard.document",
"bskyPostRef": {
"cid": "bafyreig3dgay7za2lbw57rg4boer2lpcxpc3y2rayq57psbgrvv55qwq4i",
"uri": "at://did:plc:i7budt2wflrcfy6jtvfocbix/app.bsky.feed.post/3mfjpwkwvb4w2"
},
"path": "/viewtopic.php?p=1278226#p1278226",
"publishedAt": "2026-02-23T06:01:59.000Z",
"site": "https://www.tt-forums.net",
"tags": [
"DarkCorner"
],
"textContent": "In OpenTTD 15.1, I create 3 or 4 lanes of roads or tramways at least 5 squares long next to an industrial building.\nAbove, I place through-stations along the entire length of the lane, but all vehicles stop at the first station and don't flow the entire length of the lane, thus generating a long queue of incoming vehicles.\nNow I try multiple one-square-long lanes with a single station, but still not all the stations are used.\nWhere am I going wrong?\n\nStatistics: Posted by DarkCorner — 23 Feb 2026 06:01\n\n* * *",
"title": "General OpenTTD • In lanes, not all through-stations are used.",
"updatedAt": "2026-02-23T06:01:59.000Z"
}