{
  "$type": "site.standard.document",
  "bskyPostRef": {
    "cid": "bafyreif6jq65qwwkn77ksv2d56g3s5brfcs4wrf353fyziglfxmgeejbay",
    "uri": "at://did:plc:dnm6igifkzxchftbbw2uaxbj/app.bsky.feed.post/3mjhhfhhednf2"
  },
  "coverImage": {
    "$type": "blob",
    "ref": {
      "$link": "bafkreig3ty3cqcn2pinjgdfqcscot26aqawm33srhxkbomentnwwrx6pye"
    },
    "mimeType": "image/jpeg",
    "size": 377949
  },
  "path": "/2026/04/kazakhstan-expands-energy-sector-while-advancing-renewable-capacity/",
  "publishedAt": "2026-04-14T11:40:15.000Z",
  "site": "https://astanatimes.com",
  "tags": [
    "Business",
    "Kazakhstan Expands Energy Sector While Advancing Renewable Capacity",
    "The Astana Times"
  ],
  "textContent": "The Astana Times provides news and information from Kazakhstan and around the world.\n\nASTANA – Kazakhstan plans to commission ten renewable energy facilities this year, including four wind, five solar, and one hydropower plant, with a total capacity of approximately 245 megawatts (MW), as part of ongoing efforts to strengthen the fuel and energy sector and ensure long-term energy security. Energy Minister Yerlan Akkenzhenov presented the results of…\n\nThe post Kazakhstan Expands Energy Sector While Advancing Renewable Capacity appeared first on The Astana Times.",
  "title": "Kazakhstan Expands Energy Sector While Advancing Renewable Capacity"
}