Surveying London's HS2 tunnels | GIM Int'l
London Reconnections [Unofficial]
June 29, 2026
As part of Britain’s new high-speed railway project (HS2), six tunnel-boring machines have been driving through clay, sand and ever-shifting ground beneath the streets of London. They are carving out the tunnels that will one day enable trains to reach the heart of the British capital faster.
Discussion in the ATmosphere