{
"$type": "site.standard.document",
"bskyPostRef": {
"cid": "bafyreiboinwi3l6pj2mmb7t7om5ophrrocmfb3ucbu7nxvqode5przzjza",
"uri": "at://did:plc:amgpmo7quvdl4rzvmmjibtx6/app.bsky.feed.post/3mlomsg3mloc2"
},
"coverImage": {
"$type": "blob",
"ref": {
"$link": "bafkreia6baou3rakma6dqp5psbjhc3f5b6zuny464ls6zfg43ckrz36du4"
},
"mimeType": "image/jpeg",
"size": 472484
},
"path": "/2026/05/12/us/politics/lincoln-memorial-pool-repairs.html",
"publishedAt": "2026-05-12T18:26:54.000Z",
"site": "https://www.nytimes.com",
"tags": [
"United States Politics and Government",
"Government Contracts and Procurement",
"National Mall (Washington, DC)",
"Lincoln Memorial (Washington, DC)",
"Atlantic Industrial Coatings LLC",
"Interior Department",
"National Park Service",
"Trump, Donald J",
"Washington (DC)"
],
"textContent": "Work on the iconic National Mall basin appears behind schedule. President Trump initially said he had picked the contractor, then said he did not know it.",
"title": "Reflecting Pool Repairs Appear Uneven and Behind Schedule, Officials Say"
}