{
  "$type": "site.standard.document",
  "bskyPostRef": {
    "cid": "bafyreidrjy2jpm6lg6forhwgj6bwi44d45ekanc72z5y2sjbopdtw4qgw4",
    "uri": "at://did:plc:aj7wkiqt5fdikve32wzlr3dz/app.bsky.feed.post/3mfsjdosdqor2"
  },
  "coverImage": {
    "$type": "blob",
    "ref": {
      "$link": "bafkreict5nlure3nl6d2qtdswciyy5eyufal6brt6xhjavfd4hgtesuki4"
    },
    "mimeType": "image/jpeg",
    "size": 1976009
  },
  "path": "/blogs/missions/2026/02/26/teams-begin-artemis-ii-repairs-in-vehicle-assembly-building/",
  "publishedAt": "2026-02-26T21:50:19.000Z",
  "site": "https://www.nasa.gov",
  "tags": [
    "Artemis",
    "Artemis 2",
    "Exploration Systems Development Mission Directorate",
    "Kennedy Space Center",
    "Missions",
    "Orion Multi-Purpose Crew Vehicle",
    "Space Launch System (SLS)",
    "Teams Begin Artemis II Repairs in Vehicle Assembly Building",
    "NASA Science"
  ],
  "textContent": "Once NASA’s Artemis II SLS (Space Launch System) rocket and Orion spacecraft arrived at the Vehicle Assembly Building (VAB) Feb. 25, technicians immediately began addressing why the flow of helium to the SLS upper stage was interrupted as engineers were reconfiguring the rocket following a successful wet dress rehearsal on Feb. 21. To make the […]\n\nThe post Teams Begin Artemis II Repairs in Vehicle Assembly Building appeared first on NASA Science.",
  "title": "Teams Begin Artemis II Repairs in Vehicle Assembly Building"
}