{
"$type": "site.standard.document",
"bskyPostRef": {
"cid": "bafyreidohhqicih7ixxpjvkbloucgayzsqz2gkskowskjsbf2zzknyds7m",
"uri": "at://did:plc:2vd2xc4ai4mz4rotuxqzbibh/app.bsky.feed.post/3mmwofyj7mwf2"
},
"coverImage": {
"$type": "blob",
"ref": {
"$link": "bafkreibqidukes2mqmr474kgx4hrtpkdg2fhk7fwzt622t2io46x6c3ove"
},
"mimeType": "image/jpeg",
"size": 43425
},
"path": "/latest/work-begins-on-3-2m-scheme-to-replace-sections-of-132-year-old-rail-bridge-in-leeds-28-05-2026/",
"publishedAt": "2026-05-28T12:32:16.000Z",
"site": "https://www.newcivilengineer.com",
"tags": [
"Latest",
"Work begins on £3.2M scheme to replace sections of 132-year old rail bridge in Leeds",
"New Civil Engineer"
],
"textContent": "Work has begun to strengthen a 132‑year‑old railway bridge in Leeds for the purpose of keeping the structure safe and serviceable for both trains and road users.\n\nThe post Work begins on £3.2M scheme to replace sections of 132-year old rail bridge in Leeds appeared first on New Civil Engineer.",
"title": "Work begins on £3.2M scheme to replace sections of 132-year old rail bridge in Leeds"
}