{
"$type": "site.standard.document",
"bskyPostRef": {
"cid": "bafyreieis6m5vmbrmrhbxlgyd4ogbqvw3dvbk3gpc7rnp5fdbmc2mbicii",
"uri": "at://did:plc:2vd2xc4ai4mz4rotuxqzbibh/app.bsky.feed.post/3mmq4gsk3qou2"
},
"coverImage": {
"$type": "blob",
"ref": {
"$link": "bafkreifosrepfnjp6nhdbr6oh73sjvvvvo6jlbfchh32z6ofzo5rhg2tli"
},
"mimeType": "image/jpeg",
"size": 39735
},
"path": "/in-depth/which-solution-minimises-traffic-disruption-during-menai-suspension-bridge-repairs-26-05-2026/",
"publishedAt": "2026-05-26T03:00:22.000Z",
"site": "https://www.newcivilengineer.com",
"tags": [
"Ageing assets",
"Bridges",
"In Depth",
"Smart solution minimises traffic disruption during Menai Suspension Bridge repairs",
"New Civil Engineer"
],
"textContent": "With just two years to go before the 30-year PFI concession for the A55 Anglesey extension comes to an end, the final phase of works to repair and future-proof the historic Menai Suspension Bridge in north Wales has just begun.\n\nThe post Smart solution minimises traffic disruption during Menai Suspension Bridge repairs appeared first on New Civil Engineer.",
"title": "Smart solution minimises traffic disruption during Menai Suspension Bridge repairs"
}