{
  "$type": "site.standard.document",
  "bskyPostRef": {
    "cid": "bafyreiexwc635hll2zxsnw55ub7nvysg5scudfngtedsesqu6hheoyt3gq",
    "uri": "at://did:plc:2vd2xc4ai4mz4rotuxqzbibh/app.bsky.feed.post/3mlu7l6ifhvy2"
  },
  "coverImage": {
    "$type": "blob",
    "ref": {
      "$link": "bafkreihdt5eq7g5oig4oe7pjlzbr2lbtg6n2ylhylprofyu6uzogdc6fga"
    },
    "mimeType": "image/jpeg",
    "size": 54486
  },
  "path": "/latest/hampshire-london-train-proposal-rejected-due-to-scale-of-infrastructure-work-needed-14-05-2026/",
  "publishedAt": "2026-05-14T08:10:32.000Z",
  "site": "https://www.newcivilengineer.com",
  "tags": [
    "Latest",
    "Hampshire-London train proposal rejected due to scale of infrastructure work needed",
    "New Civil Engineer"
  ],
  "textContent": "The Office of Rail and Road (ORR) has rejected a bid for a new train service from a village in Hampshire to London Waterloo because of the extensive infrastructure work that would be required.\n\nThe post Hampshire-London train proposal rejected due to scale of infrastructure work needed appeared first on New Civil Engineer.",
  "title": "Hampshire-London train proposal rejected due to scale of infrastructure work needed"
}