{
  "$type": "site.standard.document",
  "bskyPostRef": {
    "cid": "bafyreicq5us7yqqen7sdezgcmmpvj6uos2d76bxjkc6ugkkmzzpr555nnu",
    "uri": "at://did:plc:2vd2xc4ai4mz4rotuxqzbibh/app.bsky.feed.post/3mjywwiddwsy2"
  },
  "coverImage": {
    "$type": "blob",
    "ref": {
      "$link": "bafkreiduwmxbpwvzbua7vabd6av6wmgqcfgwdvo36l3csgkdxj4dbh3ufu"
    },
    "mimeType": "image/jpeg",
    "size": 40383
  },
  "path": "/latest/dfto-director-concerned-about-length-of-2bn-hs2-trains-21-04-2026/",
  "publishedAt": "2026-04-21T09:49:25.000Z",
  "site": "https://www.newcivilengineer.com",
  "tags": [
    "Latest",
    "DfTO director concerned about length of £2bn HS2 trains",
    "New Civil Engineer"
  ],
  "textContent": "A former non-executive director at the Department for Transport Operator (DfTO) raised concerns regarding the length of trains HS2 Ltd procured in a contract slated to be worth £2bn.\n\nThe post DfTO director concerned about length of £2bn HS2 trains appeared first on New Civil Engineer.",
  "title": "DfTO director concerned about length of £2bn HS2 trains"
}