{
"$type": "site.standard.document",
"bskyPostRef": {
"cid": "bafyreicir2vl5cwgfqnfe63fobcbpwdsiwn7pvove4zun4fmpjfuxvuzoe",
"uri": "at://did:plc:2vd2xc4ai4mz4rotuxqzbibh/app.bsky.feed.post/3mjkol7s5zbd2"
},
"coverImage": {
"$type": "blob",
"ref": {
"$link": "bafkreifgstfzyp2vx234zz2cgwfmjbu5zkn5vy7ktt7naog54bd2q453ya"
},
"mimeType": "image/jpeg",
"size": 41423
},
"path": "/latest/kier-bam-nuttall-volker-stevin-and-taylor-woodrow-avoided-nearly-100m-of-project-costs-after-training-scheme-15-04-2026/",
"publishedAt": "2026-04-15T10:25:43.000Z",
"site": "https://www.newcivilengineer.com",
"tags": [
"Latest",
"Kier, Bam Nuttall, VolkerStevin and Taylor Woodrow avoided nearly £100M of project costs after training scheme",
"New Civil Engineer"
],
"textContent": "Four major UK construction and infrastructure firms avoided £92.6M worth of errors after signing up to a “landmark” training programme from the Get It Right Initiative (Giri) to reduce error in construction.\n\nThe post Kier, Bam Nuttall, VolkerStevin and Taylor Woodrow avoided nearly £100M of project costs after training scheme appeared first on New Civil Engineer.",
"title": "Kier, Bam Nuttall, VolkerStevin and Taylor Woodrow avoided nearly £100M of project costs after training scheme"
}