External Publication
Visit Post

TBM launched on National Grid’s 2.2km power tunnel under the Thames

New Civil Engineer [Unofficial] March 12, 2026
Source
A 271.5t tunnel boring machine (TBM) has begun excavating a 2.2km tunnel beneath the River Thames as part of National Grid’s Grain to Tilbury project. The post TBM launched on National Grid’s 2.2km power tunnel under the Thames appeared first on New Civil Engineer.

Discussion in the ATmosphere

Loading comments...