{
"$type": "site.standard.document",
"bskyPostRef": {
"cid": "bafyreiaxhjlgmximo5konqjfd6oolnpl7cjejb2l2q2ty6ghd5muxeqycq",
"uri": "at://did:plc:2vd2xc4ai4mz4rotuxqzbibh/app.bsky.feed.post/3mfan2y22ry42"
},
"coverImage": {
"$type": "blob",
"ref": {
"$link": "bafkreigdcon2zzcpl5vhqh2ih5jrone3e5fugmlot3fnjfgscppx4rbiyi"
},
"mimeType": "image/jpeg",
"size": 141250
},
"path": "/latest/todmorden-station-accessibility-upgrade-contractor-booted-for-unsafe-behaviours-19-02-2026/",
"publishedAt": "2026-02-19T14:37:05.000Z",
"site": "https://www.newcivilengineer.com",
"tags": [
"Latest",
"Todmorden station accessibility upgrade contractor booted for ‘unsafe behaviours’",
"New Civil Engineer"
],
"textContent": "An accessibility scheme at a train station in West Yorkshire has been passed over to Network Rail after contractor Input Group was “stood down for unsafe behaviours”, according to a minister in the Department for Transport (DfT).\n\nThe post Todmorden station accessibility upgrade contractor booted for ‘unsafe behaviours’ appeared first on New Civil Engineer.",
"title": "Todmorden station accessibility upgrade contractor booted for ‘unsafe behaviours’"
}